Time-Scaled Schedule Network Diagram. Any project schedule network diagram drawn in such a way that thepositioning and length of the schedule activity represents its duration. Essentially, it is a bar chart that includesschedule network logic.
This definition was found in the PMBOK V5
Go back to the Glossary or to the Mapping